The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period, and Electrotech wants to maximize profit. Formulate a linear programming model for this problem

+1
Answers (1)
  1. 20 December, 18:19
    0
    Generator = G and Alternator = A

    Maximize 250G + 150A

    2G + 3A = 260

    G + 2A = 140
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products ...” in 📙 Business if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers