During the month of September, direct labor cost totaled $11,000 and direct labor cost was 40% of prime cost. If total manufacturing costs during September were $73,000, the manufacturing overhead was: (A) $16,500 (B) $27,500 (C) $62,000 (D) $45,500
Answers (1)