Ask Question
5 February, 14:38

A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. Production rate of the line is 40 units/hr. The proportion uptime is 96% and the repositioning time is 9 sec. Determine the balance delay on the line

+4
Answers (1)
  1. 5 February, 17:02
    0
    Balance delay is the percentage of wasted time calculated as 100% - efficiency. on the line is 0.085 or 8.5%

    Explanation:

    Given details

    numbers of workstations (n) = 25

    manning level = 1.0

    work content time (Twc) = 29.5 min

    production rate = 40 units/hr

    proportion uptime = 96% = 0.96

    repositioning time = 9 sec.

    balance delay = ?

    Solution

    Cycle time (Tc) = 60 (0.96) / 40 = 1.44 min

    Ts = 1.44 - 0.15 = 1.29 min

    Line balance efficiency (Eb) = Twc / (n*Ts) = 29.5/25 (1.29) = 0.915

    Balance delay (d) is the percentage of wasted time calculated as 100% - efficiency.

    d = 1 - 0.915 = 0.085 = 8.5%
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. ...” in 📙 Physics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers