Ask Question
29 December, 13:10

Part X requires machining on a milling machine (operations A and B are required).

Find the number of machines required to produce 3000 parts per week. Assume the company will be operating five days per week, 18 hours per day. The following infor - mation is known:

Operation Standard Time Efficiency Reliability Scrap

A 3 min 95% 95% 2%

B 5 min 95% 90% 5%

Note: The milling machine requires tool changes and preventive maintenance after every lot of 500 parts. These changes require 30 minutes.

+1
Answers (1)
  1. 29 December, 16:47
    0
    Answer:atleast 5 machines

    Explanation:

    Quantity required (Q) = 3000

    Maintainace due = 500 parts

    3000 / 500 = 5 = 6 Maintainace

    Repair time = 6 * 30 minutes = 300 minutes = 5 hours.

    operation time = 5 * 18 * 60 = 5400 minutes

    Total operation time = Total operation hours - repair time

    5400 - 300 = 5100 hours

    For A:

    (Standard time * Q) / (reliability * time efficiency * scrap * total working hours)

    (3 * 3000) / (. 95*.95*5100)

    9000/4602.75 = 1.96

    For B:

    (Standard time * Q) / (reliability * time efficiency * scrap * total working hours)

    (5 * 3000) / (.95*.9*5100)

    15000/4360.5 = 3.44

    (1.96 + 3.44) = 166.56

    =5. 4
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “Part X requires machining on a milling machine (operations A and B are required). Find the number of machines required to produce 3000 ...” in 📙 Business if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers