Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 20,000 direct labor-hours would be required for the period's estimated level of production. The company also estimated $94,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.00 per direct labor-hour. Harris's actual manufacturing overhead cost for the year was $123,900 and its actual total direct labor was 21,000 hours. Required: Compute the company's plantwide predetermined overhead rate for the year. (Round your answer to 2 decimal places.)

+4
Answers (1)
  1. 10 April, 03:11
    0
    Predetermined overhead rate = $6.7

    Explanation:

    Giving the following information:

    Estimated that 20,000 direct labor-hours.

    Estimated $94,000 of fixed manufacturing overhead cost.

    Variable manufacturing overhead of $2.00 per direct labor-hour.

    Harris's actual manufacturing overhead cost for the year was $123,900 and its actual total direct labor was 21,000 hours.

    Predetermined overhead rate = estimated total manufacturing overhead costs / total amount of allocation base

    Predetermined overhead rate = (94000 + 2*20000) / 20000

    Predetermined overhead rate = $6.7
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the ...” in 📙 Business if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.