San Juan, Inc. is considering two alternatives: A and B. The costs associated with the alternatives are listed below: Alternative A Alternative B Material costs $ 38,000 $ 66,000 Processing costs 43,000 66,000 Building costs 13,700 36,000 Equipment
Answers (1)