Ask Question
18 April, 08:33

At an activity level of 8700 machine-hours in a month, Falks Corporation's total variable production engineering cost is $728,190 and its total fixed production engineering cost is $232,290. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 8900 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)

+2
Answers (1)
  1. 18 April, 11:34
    0
    Total cost = $977,220

    Explanation:

    Variable cost.

    They vary with volume of activity

    Variable cost per machine hour = Total variable cost/machine hours

    VC per machine hour = 728,190 / 8700 = $83.7 per machine hour

    Fixed cost of maintenance

    The fixed costs are cost that remain the same within an activity. The don't vary with volume withing an activity range.

    Fixed costs = $232,290.

    Total cost at 8,900 hours

    = variable cost + fixed cost

    = ($83.7 * 8900) + $232,290.

    Total cost = $977,220
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “At an activity level of 8700 machine-hours in a month, Falks Corporation's total variable production engineering cost is $728,190 and its ...” in 📙 Business if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers