Overhead is usually calculated:

a

tracking each indirect labor worker

b

estimating the cost using a rate

c

identifying the material waste not used in production

d

by knowing the direct product cost

+1
Answers (1)
  1. 9 May, 09:39
    0
    Estimating the cost using a rate

    Explanation:

    Overhead cost are the cost portion of a product that can re bot directly linked to a particular cost unit. In other words, overhead can be referred to as general expenses incurred in production.

    Going by its nature, its allocation to a unit of production is not direct and it involves a bit of analysis and calculation. therefore, one of the ways of calculating overhead is by estimating the cost using a rate
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “Overhead is usually calculated: a tracking each indirect labor worker b estimating the cost using a rate c identifying the material waste ...” in 📙 Business if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers