Time, budget, and safety are almost always considered to be

1. Efficiency

2. Constraints

3. Trade-offs

4. Criteria

+5
Answers (2)
  1. 22 March, 14:45
    0
    The answer is option # 2. (Constraints).
  2. 22 March, 15:52
    0
    The answer is constraints