Sign In
Ask Question
Engineering
Marcelo Wolfe
22 October, 21:05
Define full and partial well abandonment.
+4
Answers (
1
)
Abril Rios
22 October, 23:19
0
Partial and Fully abandonment of well is a term used for oil well
Explanation:
Full Abandonment - This condition is depend on economics of the oil well. when production from oil well is come to that level when operating cost become higher than operating income, then it is need to shut down the well fully to prevent further loss.
Partial Abandonment - in this condition only the base part of the well is neglect permanently and from the upper portion of the well sidetracked well is build to acquire new target.
Comment
Complaint
Link
Know the Answer?
Answer
Not Sure About the Answer?
Get an answer to your question ✅
“Define full and partial well abandonment. ...”
in 📙 Engineering if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers
You Might be Interested in
A window air conditioner unit is placed on a laboratory bench and tested in cooling mode using 750 W of electric power with a COP of 1.75. What is the cooling power capacity and what is the net effect on the laboratory?
Answers (1)
From the list below, select four situations in which casting is the preferred fabrication technique. (1) For alloys having low ductilities (2) When it is the most economical fabrication technique (3) When it is needed to join a large variety of
Answers (1)
A bus travels the 100 miles between A and B at 50 mi/h and then another 100 miles between B and C at 70 mi/h. The average speed of the bus for the entire 200-mile trip is: a. More than 60 mi/h. b. Equal to 60 mi/h. c. Less than 60 mi/h.
Answers (1)
After the 2015 AFC Championship football game between the New England Patriots and the Indianapolis Colts, it was alleged that the New England Patriots had under inflated eleven of their twelve footballs.
Answers (1)
A mysterious device found in a forgotten laboratory accumulates charge at a rate specified by the expression gm = 9 - 10tC from the moment it is switched on. (a) Calculate the total charge contained in the device at t: O.
Answers (1)
New Questions in Engineering
A vacuum gauge indicates that the pressure of air in a closed chamber is 02 bar (vacuum) The pressure of the surrounding atmosphere is equivalent to 750 in of mercury The density of mercury is 13.95 g / cn and the acceleration of gravity is 9.8.
Answers (1)
The Reynolds number for flow over a fixed horizontal flat plate is constant throughout its length. a) True b) False
Answers (1)
Briefly describe the function of the thermostatic expansion valve in a vapour compression refrigeration system
Answers (1)
An agent in another state wants to become an agent in New York. The other state gives the same privileges to New York agents wanting to be licensed in that state as it does its own agents.
Answers (1)
What color is dot 5 brake fluid
Answers (1)
Home
»
Engineering
» Define full and partial well abandonment.
Sign In
Sign Up
Forgot Password?