A manufacturer of electronic equipment requires a certain rare metal. He has a reserve supply of 4,000,000 units that he will not be able to replace. If the rate at which the metal is used is given by f (t) = 100,000e. 03t where t is time in years, how long will it be before he uses his supply?

+5
Answers (1)
  1. 10 October, 22:23
    0
    This is the concept of algebra, we are required to get the time taken for the materials to be used up, given that the rate at which the metal is used is given by:

    f (t) = 100000e^ (0,03t)

    4000000=100000e^ (0,03t

    40=e^ (0.03t)

    introducing natural logs we get:

    ln40=0.03t

    thus;

    t = (ln40) / 0.03

    t=122.96=123

    The time taken before the material is used up will be 123
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “A manufacturer of electronic equipment requires a certain rare metal. He has a reserve supply of 4,000,000 units that he will not be able ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.