James needs 50 tons of dirt for a large construction project. He already has 3 tons of dirt at the construction site. Each dump truck can transport 8 tons of dirt. How many trips does the dump truck need to take to reach 50 tons of dirt?

A.

5

B.

6

C.

7

D.

8

+1
Answers (1)
  1. 29 July, 04:26
    0
    If he already has 3 tons of dirt at the site, He needs 50-3=47 tons to be carried by the truck

    Minimum number of trips the truck will need to take=47/8

    =5.875

    But since the truck cannot actually take 5.875 trips, it will take the next whole number of trips so it will take 6 trips. (B)
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “James needs 50 tons of dirt for a large construction project. He already has 3 tons of dirt at the construction site. Each dump truck can ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.