Ask Question
14 June, 07:48

it takes tom 3 minutes to wash a car, and it takes jerry 6.7 minutes to wash the same car, how long does it take for them to wash the car together?

+4
Answers (2)
  1. 14 June, 09:46
    0
    i think 3.7

    Step-by-step explanation:

    might be wrong.
  2. 14 June, 10:32
    0
    Answer: it takes them 2.13 minutes to wash the car together.

    Step-by-step explanation:

    It takes Tom 3 minutes to wash a car. This means that the rate at which Tom washes the car per minute is 1/3

    It takes Jerry 6.7 minutes to wash the same car. This means that the rate at which Jerry washes the car per minute is 1/6.7

    If they work together, they would work simultaneously and their individual rates are additive. This means that their combined working rate would be

    1/3 + 1/6.7 = 9.7/20.1

    Assuming it takes t hours for both of them to clean the room working together, the working rate per hour would be 1/t. Therefore,

    9.7/20.1 = 1/t

    t = 20.7/9.7

    t = 2.13 minutes
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “it takes tom 3 minutes to wash a car, and it takes jerry 6.7 minutes to wash the same car, how long does it take for them to wash the car ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers