A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which part of the measurements are sufficient to show the beams are parallel
+5
Answers (1)
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Home » Mathematics » A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which part of the measurements are sufficient to show the beams are parallel