Ask Question
21 September, 22:38

A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which part of the measurements are sufficient to show the beams are parallel

+5
Answers (1)
  1. 21 September, 23:52
    0
    Answer:221121
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers