A cable is being replaced 15 meters beneath the surface of a body of water. The new cable must extend from a pole located 9 meters above the surface of the water. A contractor can bill $30 for each meter of cable replaced. What is the minimum cost of the replacement?

+1
Answers (1)
  1. 14 February, 04:57
    0
    Step-by-step explanation:

    Total cable length = 15m + 9m = 24m

    $30 per meter * 24m = $720
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “A cable is being replaced 15 meters beneath the surface of a body of water. The new cable must extend from a pole located 9 meters above ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.