Ask Question
8 February, 11:04

Three pieces of ribbons measuring 0.5km, 1005cm and 1,800mm respectively are joined end to end form a single one. How long is the new ribbon? Find the cost of the single so formed at the rate of Rs. 12 per meter?

+5
Answers (1)
  1. 8 February, 13:28
    0
    The new ribbon is 511.85 meter long.

    The total cost Rs. 6142.2

    Step-by-step explanation:

    First of all we convert all lengths to the standard unit that is meter.

    0.5 km = 500 meter

    1005 cm = 10.05 meter

    1800 mm = 1.8 meter

    total length in meters

    500+10.05+1.8 = 511.85

    total cost at the rate of Rs. 12 per meter will be

    511.85*12=6142.2
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “Three pieces of ribbons measuring 0.5km, 1005cm and 1,800mm respectively are joined end to end form a single one. How long is the new ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers