Ask Question
22 April, 13:32

An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/hour, how many minimum work stations will be needed

+4
Answers (1)
  1. 22 April, 13:57
    0
    Answer: 8 minimum work stations is what would be needed.

    Step-by-step explanation:

    The cycle time is computed as the operating time daily divided by the scheduled output.

    It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.

    Therefore,

    If you need to produce 30units/hour.

    The average cycle time is as follow:

    The average cycle time is the average time between the completions of units.

    60/30 = 2 average cycle time

    =16/2

    =8

    8 work stations is the minimum number that would be needed.

    It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/hour, how ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.