Ask Question
4 December, 19:42

How much work is done lifting a 10 pound calculus book from the ground to the top of a 30 foot building with a cable which weighs 2 pounds per foot?

+5
Answers (1)
  1. 4 December, 20:51
    0
    1200 ft·lb

    Step-by-step explanation:

    On average, you're lifting the 60-lb cable a distance of 15 ft, so doing 900 ft·lb of work. Lifting the 10-lb calculus book 30 ft requires 300 ft·lb of work.

    The total work is 900 ft·lb + 300 ft·lb = 1200 ft·lb.
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “How much work is done lifting a 10 pound calculus book from the ground to the top of a 30 foot building with a cable which weighs 2 pounds ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers