Ask Question
23 December, 02:26

Hannah has some scraps of ribbon measuring 3.52 meters, 17.3 meters and 27.009 meters. Does she have enough to do a project requiring 50 meters of ribbon? If yes, how much ribbon will she have left? If no, how much more ribbon does she need?

+2
Answers (1)
  1. 23 December, 06:18
    0
    No, 2.171m.

    Step-by-step explanation:

    Add all of measurements. 3.52+17.3+27.009=47.829

    Compare 2 numbers.

    47.829<50

    So she needs more ribbon, because the length she has is less the requirement, 50m.

    Find the difference (the length she needs).

    50-47.829=2.171
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “Hannah has some scraps of ribbon measuring 3.52 meters, 17.3 meters and 27.009 meters. Does she have enough to do a project requiring 50 ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers