A 1300 kg elevator is lifted at a constant speed of 1.3 m/s through a height of 22 m. How much work is done (a) by the tension in the elevator cable and (b) by gravity?

+3
Answers (1)
  1. 25 December, 22:34
    0
    Wc = mgd = 280 kj

    Wg = mgd = - 280 kJ
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “A 1300 kg elevator is lifted at a constant speed of 1.3 m/s through a height of 22 m. How much work is done (a) by the tension in the ...” in 📙 Physics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.