An american engineer who had been transferred to europe was asked to build bridge pilings exactly as he had in the united states. each piling required 20.0 cubic yards of concrete in the united states. how many cubic meters of concrete are required for each piling? given: 1 yd = 0.914 m.
+3
Answers (1)
Know the Answer?
Not Sure About the Answer?
Get an answer to your question ✅ “An american engineer who had been transferred to europe was asked to build bridge pilings exactly as he had in the united states. each ...” in 📙 Mathematics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.