Sign In
Ask Question
Physics
Rags
17 July, 23:22
A fallen tree rose 2.75 m. Find the work done?
+4
Answers (
1
)
Jamya Baxter
18 July, 02:31
0
26.95 x m Joules
Explanation:
Given parameters:
Height of rise of tree = 2.75m
Unknown:
Work done by the tree = ?
Solution:
Work done by any body is the distance it moves as a result of applied force. It is expressed mathematically below;
Work done = Force x distance moved
In this kind of problem,
Distance moved = height of rise
Force = weight of tree = m g
Where m = mass of tree
g = acceleration due to gravity = 9.8m/s²
Now;
W = mgh
W = m x 9.8 x 2.75
W = 26.95 x m Joules
Since m, the mass of the tree is not given, we cannot solve the problem completely
Comment
Complaint
Link
Know the Answer?
Answer
Not Sure About the Answer?
Get an answer to your question ✅
“A fallen tree rose 2.75 m. Find the work done? ...”
in 📙 Physics if there is no answer or all answers are wrong, use a search bar and try to find the answer among similar questions.
Search for Other Answers
You Might be Interested in
Do tectonic plates cover most of earth but not all of it?
Answers (1)
Which nuclei is NOT radioactive?
Answers (1)
Which of the following items would have the lowest density? OA. A 12 cm3 block of aluminum with a mass of 2 grams OB. A6 cm3 block of ice with a mass of 4 grams OC. A 12 cm3 block of wood with a mass of 3 grams OD.
Answers (1)
Why would a large amount of hot water feel hotter than a small amount of hot water
Answers (1)
SI units are useful because they are all related by multiples of
Answers (1)
New Questions in Physics
When a siren is approaching you, how does the wavelength of the waves reaching you compare to the actual wavelength that the siren emits?
Answers (1)
In a harbor, you can see sea waves traveling around the edges of small stationary boats. Why does this happen?
Answers (2)
Correct unit of speed
Answers (2)
Technician A says that for best results, loosen the fastener immediately after spraying it with penetrating oil. Technician B says that rusted fasteners may be loosened by tapping with a hammer. Which technician is correct? a. technician A only b.
Answers (1)
A roller coaster track is 3,000 meters long. It takes 100 seconds to travel once around the roller coaster. Is the velocity constant throughout the trip? Explain.
Answers (1)
Home
»
Physics
» A fallen tree rose 2.75 m. Find the work done?
Sign In
Sign Up
Forgot Password?